Product Details

Water Retention Paver Brick for Walkway

Essential Information of Paver Brick

Ceramic paver brick uses waste ceramics as raw material, is formed by secondary fabric and is fired at high temperature. It is a new green environmental protection product; it is also an ideal product to beautify the city, improve the living environment and improve the quality of life of residents. This product is widely used in public building squares, urban roads, subways, stations, highways, villas, residential quarters, parks, art landscapes, courtyard decorations, etc.

Product

Water Retention Paver Brick for Walkway

Raw Materials

Slag waste, waste ceramics

Size

300*300*55mm; 300*150*55mm

200*200*55mm; 200*100*55mm

Color

brown, yellow, grey, blue, white, red, green

Futures

Good water permeability; Economical; heat preservation

Application

Walkway, driveway, landscape, parking lot, street

Delivery time

15-20days after receiving deposit

Payment terms

T/T; L/C

Packing

Standard packing


Construction Procedure of Paver Brick

Step1

Before the pavement is paved, the roadbed is fully rolled to ensure that the road surface is level.

Step2

After confirming that the road surface is flat, it is best to lay a 100mm thick gravel with a diameter of ≤40mm, and then compact it with a vibrating machine.

The thickness of the gravel layer is approximately 200 mm.

Step3

The nonwoven fabric is laid on the gravel. In order to prevent the separation of the soil layer, the non-woven fabric interface portion needs to be folded over 100 mm thick.

Step4

Paving 30-50mm buffer sand and fully compacting, then manually adjust the flatness and height of the buffer sand. (You can use ordinary river sand, the cost is lower)

Step5

The ceramic permeable brick is laid and fixed at a right angle formed by a horizontal line, and the reference line and the seam line and the horizontal line match each other. (If it exceeds or is less than ±3mm, it needs construction workers to adjust with rubber hammer)

Step6

Adjust the gap between the brick and the brick and adjust it along the horizontal line so that the bricks of all the bricks are sewn into a straight seam.

Step7

Spread the dry fine sand and sweep the gray sand evenly into the ash seam with a broom.

Step8

The paved ceramic permeable brick is pressed by a rolling machine, and the time is usually about 40 minutes, and the rolling is repeated 4-5 times. (It is important to note that before compaction, please attach a rubber protective layer on the roller to avoid damage to the surface of the ceramic permeable brick)

Step9

After cleaning, it is necessary to sprinkle water to solidify the brick joints, and avoid walking and rolling within six hours after construction. If it is rainy, it needs to be covered.