Maldives Precast Concrete Wall Panel

Maldives Precast Concrete Wall Panel

solid core panel (SPB) is made of EPS cement compound; While composite sandwich panel (FPB) uses EPS cement compound as core, calcium silicate boards as faces on both sides. And reinforced panel (CPB) with acoustic proof materials or steel grid/bar as embedded layer for special requirements. Our...
Chat Now

Product Details

Solid core panel (SPB) is made of EPS cement compound; While composite sandwich panel (FPB) uses EPS cement compound as core, calcium silicate boards as faces on both sides. And reinforced panel (CPB) with acoustic proof materials or steel grid/bar as embedded layer for special requirements.  

HTB1ocbMXZnrK1RkHFrdq6xCoFXad_.webp.jpg


Our ZJT Panel can be used for all types of building both externally and internally
.Private housing
.Skyscrapers
.Buildings
.Commercial units
.Building externsions
.Boundary walls
.Interior decorative walls
.Skyscrapers
.Labour accommdations
.Warehouse
.House externsions
,Partitioning
.Exterior Landscape walls

eps cement sandwich wall panel for exterior walls (3)

p4



Light weight composite sandwich wall panels installation process:

1.Put wire,transport board in place,popup or down the wall plate and gauge double in the respective axis mount.

2.Any use of drilling to cut according to wall plate specifications.

3.Put cement binder and wall board in foundation.

4.Put cement binder,two pieces of the tenon on one side cement to wipe polymer mortar on any tongue and sides.

5.Installation,firstly prepare for the installation of plate moved into connection location,wall correction with a crowbar,use force tightly,to let polymer mortar extrusion from the joints in high spirits. 

6.Adjustment,use wood wedge to bit into the bottom of the wall plate so that it adjust vertical formation

7.Correction,fix,use more than 2m or 2m guiding rule to check vertical,flat correction.

8.Grout,fill the pulp,use polymer mortar to infill and flatness after correcting the wall body,use polymer mortar to fill the gap size up or down.

9.Fixed,upper part of wall panels with Φ6mm or Φ8mm steel reinforce in the middle of walls by 45 degrees to bit into,the bottom with “7shaped”ribbed steel,one head is bitten into concrete base,the other head is bitten into the wall plate

 

Simple installation process:

1.Put wire  

2.Cutting   

3.Put cement binder   

4.Put cement binder  

5.Adjustment   

6.Installation   

7.Correction   

8.Fill the pulp   9.Fixed


Contact

zoe zeng

email: zoe@zhongjingtai.com

Whatsapp/mobile: +8618559217326






Inquiry